top of page


Basement Groundwork for New Kitchen, Bathroom, Laundry, and Mechanical Room Floor Drain: Crystal Clear Water Ltd. Okanagan
Basement Groundwork for New Kitchen, Bathroom, Laundry, and Mechanical Room Floor Drain


New 1” Water Main (Utility Grade Pipe) with PVC Sleeve Going Through Rock Bed: Crystal Clear Water Ltd. Okanagan
New 1” Water Main (Utility Grade Pipe) with PVC Sleeve Going Through Rock Bed
bottom of page